THE FOLLOWING INFORMATION APPLIES TO QUESTIONS 18 THROUGH 21…

THE FOLLOWING INFORMATION APPLIES TO QUESTIONS 18 THROUGH 21: Hudson Dock Company manufactures boat docks on an assembly line. Its standard costing system uses two cost categories, direct materials and conversion costs. Each product must pass through the Assembly Department and the Finishing Department. Direct materials are added at the beginning of the production process. Conversion costs are allocated evenly throughout production (so they are using WA only WA costs are evenly allocated).            Data for the Assembly Department for May 20X5 are:                   Work in process, beginning inventory:                            70 units                            Direct materials (100% complete)                            Conversion costs (25% complete)                     Units started during May                                                 40 units                     Work in process, ending inventory:                                 10 units                            Direct materials (100% complete)                            Conversion costs (50% complete)            Costs for May:                   Standard costs for Assembly:                            Direct materials                                           $4,000 per unit                            Conversion costs                                       $16,000 per unit                     Work in process, beginning inventory:                            Direct materials                                                    $140,000                            Conversion costs                                                   $260,000 Which of the following journal entries properly records the assignment of conversion costs to work-in-process inventory and the conversion-cost variances of the Assembly Department, assuming that conversion costs are 20% higher than expected? A. Work in Process — Assembly                                      1,680,000                            Conversion-Cost Variances                                                           280,000                            Assembly Department Conversion Cost Control                        1,400,000 B. Work in Process —Assembly                                       1,680,000                            Direct Materials Variances                                                            280,000                            Testing Department Conversion Cost Control                            1,400,000 C. Work in Process — Assembly                                      1,400,000                            Conversion-Cost Variances                                                           280,000                            Assembly Department Conversion Cost Control                        1,680,000 D. Work in Process — Testing                                          1,400,000                            Assembly Department Conversion Cost Control                        1,400,000  

If there was no beginning work in process and no ending work…

If there was no beginning work in process and no ending work in process under the weighted-average process costing method, the number of equivalent units for direct materials, if direct materials were added at the start of the process, would be: equal to the units started or transferred in equal to the units completed less than the units completed Both a and b are correct.

Please note that your written work for the previous question…

Please note that your written work for the previous question must include at least one intermediate step for your calculations. Just writing in a formula with the correct values included and then an answer does not indicate to me that you have completed the work. If the worksheet includes a request to sketch a graph, then make sure you do so. If you are using geogebra for z-scores, t-values or chi square values, it is OK to use the corresponding graph as a guide for your sketch. Sketch does not mean to scale, but you need to color in the correct side of the graph and try to make a decent guess as to the location of the where the coloring starts or ends according the the value of the test statistic or alpha.  If you are using RStudio as a calculator, then you must upload the required material per our email communication.  This question will be used to record your  grade for the  written work you upload for the previous question.  No need to write anything below.