Nursing care of a patient with an oral endotracheal tube (OETT) include all of the following except:
Name 3 reasons to mutually agree to discharge a contract.
Name 3 reasons to mutually agree to discharge a contract.
A homeowner contracts with XYZ Plumbing to redo plumbing in…
A homeowner contracts with XYZ Plumbing to redo plumbing in bathrooms on the second floor. They do a poor job and pipes in walls leak to the first floor ceiling and floor damaging light fixtures, flooring and furniture. What type of damages, if any, can the homeowner recovered? (Compensatory, consequential, nominal, incidental, liquidated or punitive damages) Explain your answer. Short answer required with a minimum of 3 complete sentences.
For contract liability to exist, all conditions need to be e…
For contract liability to exist, all conditions need to be explicitly stated in the contract.
Name 3 things that a are needed to have consideration in a c…
Name 3 things that a are needed to have consideration in a contract.
Contractor ABC asks Subcontractor DEF for a bid on work to b…
Contractor ABC asks Subcontractor DEF for a bid on work to be subcontracted. Does the bid constitutes an offer or acceptance of the work?
After an offer is made, it cannot be withdrawn even before i…
After an offer is made, it cannot be withdrawn even before it was accepted.
Damages are considered to be:
Damages are considered to be:
When breach of contract caused no monetary loss, the plainti…
When breach of contract caused no monetary loss, the plaintiff is entitled to
The parol evidence rule
The parol evidence rule