We have decided to restructure the current work week as we t…
We have decided to restructure the current work week as we think it leads to unhealthy levels of stress, burnout, and overload for adults. We have given the option to either have individuals continue with the current model of working 5 days (2 at home, 3 in office) or the option of 4 10-hour days (completely in the office). Our sample size of 20 is too small for there to be statistically significant results, but those in the intervention group report greater productivity and increased satisfaction. How would this be described as practical significance?