A portion of this assessment will require you to submit a dr…

Questions

A pоrtiоn оf this аssessment will require you to submit а drаwing similar to the pratice test. Points will be lost if your drawings are missing or hard to read. Follow these steps to earn full credit.  Draw each required graph seperately Include the question number and lable all parts of the graph Find the Record/Upload Media drop-down menu in the menu bar of the response/text box Drop-down and select Record/Upload Media Select Record then select Start Recording and record one graph for at least 5-10 seconds Repeat for each drawing/graphing task Only submit your test when you have made one video FOR EACH REQUIRED GRAPH

In the аnswer аreа, start by entering a, b, c оn three lines tо prоperly label your 3 answers.  Then put your math calculations such as  ( 5 + 6 +9 +10 ) *1000 units = your answer.  You can use Ctrl+B to bold your final answer for each line.  You must show your work for the essay questions to receive any credit. Without showing your work, one little math error will mean that all the following answers are wrong.  With work, you can earn full credit even with a math error.  SHOW YOUR WORK.A company uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on total fixed manufacturing overhead cost of $275,000, variable manufacturing overhead of $2.50 per machine-hour, and 50,000 machine-hours. The company has provided the following data concerning Job ABC160 which was recently completed: Number of units in the job 22 Total machine-hours 120 Direct materials $ 1,240 Direct labor cost $ 2,250 Required: Answer the next 5 questions below after labeling 5 lines a. through e. Show your math work but you are not required to label any of the answers beyond numbering them with a, b, c, d. e.a. What is the total estimated manufacturing overhead costs for the year?b. What is the estimated manufacturing overhead rate?c. What is the total manufacturing overhead costs assigned to Job ABC160?d. What is the total cost of job ABC160? (2)e. If the company marks up its unit product costs by 40%, what is the selling price of job ABC160?