All times are in seconds in the precedence diagram. Cycle time is 82 sec/unit In this precedence diagram the total task time is 210 sec. The assembly line created by the instructor is as follows: WS1 – A WS2 – B WS3 – C WS4 – E WS5 – DF WS6 – G While the instructor’s assembly line above has 6 workstations, please calculate the theoretical minimum number of workstations?