Beans Corporation uses a job-order costing system with a sin…
Beans Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on total fixed manufacturing overhead cost of $162,000, variable manufacturing overhead of $2.80 per direct labor-hour, and 60,000 direct labor-hours. Recently, Job K818 was completed with the following characteristics: Number of units in the job 10 Total direct labor-hours 50 Direct materials $ 920 Direct labor cost $1,400 The total job cost for Job K818 is closest to: (Round your intermediate calculations to 2 decimal places.) A) $1,675 B) $2,595 C) $1,195 D) $2,320