For the following project delivery methods: 1.Who does the d…
For the following project delivery methods: 1.Who does the design lead have a contract with? 2. Do they have a formal (contractual) or informal (non-contractual) relationship with the constructor? Design-bid-build, Design Build, CM @ Risk.