If plant assets of a manufacturing company are sold at a gai…

Questions

Fill in the fоllоwing pаrts. Recаll thаt AMAT = Hit Time + Miss Rate * Miss Penalty (a) [2 pоints] Assume Hit Time is 1 cycle and the miss penalty is 100 cycles. What should be the value of the miss rate to achieve an AMAT of 2 cycles?    (b) [2 points] As in (a.) but now assume the miss penalty is 800 cycles. What is the miss rate needed to achieve an AMAT of 2 cycles?    (c) [4 points] Assume a two-level cache where the L1 hit time is as in (a.) and the hit time in the L2 cache is 2 cycles and the miss penalty is 800 cycles. Further, assume an L1 miss rate of 0.1. Show how you calculate the L2 miss rate to achieve an AMAT of 2 cycles. What is the L2 miss rate you calculated?