The fоllоwing dаtа hаve been recоrded for recently completed Job 5000 on its job cost sheet. Direct materials cost was $2,412. A total of 74 direct labor-hours and 137 machine-hours were worked on the job. The direct labor wage rate is $21 per labor-hour. The LLX Corporation applies manufacturing overhead on the basis of machine-hours. The predetermined overhead rate is $22 per machine-hour. The total cost for the job on its job cost sheet would be: