Fill in the blanks: With the Hyatt Skywalk collapse contract…
Fill in the blanks: With the Hyatt Skywalk collapse contractors decided to change the design which resulted in double loading of connections between the fourth floor bridge and the atrium roof. __________ and ________ had been designed to hold the weight of each walkway and any people standing on it. The new design change, though apparently subtle, was enough to critically undermine the safety of the structures.