For minimum-resource, latency-constrained scheduling, consider the following situation for a given cycle. Current Total ALU amount: 2 ALUs still in use from previous cycle: 2 ALU candidates: Node 1 (slack 0), Node 2 (slack 0), Node 3 (slack 3)   Which of the ALU candidates will be scheduled in this cycle? (select all that apply)